Our team travels to your site
For field work, our engineers and instruments mobilise anywhere in India — highway corridors, bridges, plants and greenfield alignments included.
Soil moisture content testing to IS 2720 Part 2 by oven-drying — natural moisture and compaction-control checks for embankments, foundations and backfill
The water (moisture) content of soil is the ratio of the mass of water to the mass of dry solids, expressed as a percentage and found by oven-drying at 110 ± 5 °C per IS 2720 (Part 2). It underpins compaction and strength testing. NKMPV determines soil water content as a NABL-accredited laboratory.
The soil water content test determines the amount of water present in a soil sample, expressed as a percentage of the dry mass of the soil. It is the most fundamental soil property and serves as the starting point for virtually every geotechnical investigation and earthwork quality control programme.
The following parameters are measured or derived during the soil water content test. While there is no universal pass/fail criterion for moisture content itself, the results are interpreted in the context of compaction specifications, bearing capacity requirements, and soil classification standards.
| Parameter | Value / Range | Unit | Standard |
|---|---|---|---|
| Water Content (w) | 0-300%+ (depending on soil type) | % | IS 2720 Part 2 |
| Drying Temperature | 110 ± 5 | °C | IS 2720 Part 2 Cl. 3.2 |
| Drying Duration | 24 hours minimum to constant mass | hours | IS 2720 Part 2 Cl. 3.2 |
| Minimum Sample Mass (Fine-grained soil) | 30 | g | IS 2720 Part 2 Cl. 3.1 |
| Minimum Sample Mass (Medium-grained soil) | 300 | g | IS 2720 Part 2 Cl. 3.1 |
| Minimum Sample Mass (Coarse-grained soil) | 3000 | g | IS 2720 Part 2 Cl. 3.1 |
| Field Moisture for Compaction Control | OMC ± 2% (typical specification) | % | IS 2720 Part 8 / MoRTH Cl. 305 |
Methods of Test for Soils — Determination of Water Content (Second Revision)
Methods of Test for Soils — Preparation of Dry Soil Samples for Various Tests
Methods of Test for Soils — Determination of Water Content-Dry Density Relation Using Heavy Compaction
Classification and Identification of Soils for General Engineering Purposes
Laboratory hot air oven with digital temperature controller
Maintains 110 ± 5°C, interior capacity for 50+ containers simultaneously
CalibratedShimadzu / Essae precision balance
200 g capacity, least count 0.01 g for fine-grained soil samples
CalibratedEssae platform balance
10 kg capacity, least count 1 g for coarse-grained soil samples
CalibratedAluminium containers with tight-fitting lids
Various sizes — 50 ml, 100 ml, and 500 ml for different soil quantities
CalibratedGlass desiccator with silica gel desiccant
250 mm diameter, accommodates 8-10 containers for cooling
CalibratedSoil samples are collected from the project site at the specified depth using disturbed or undisturbed sampling methods. For natural moisture content (NMC) determination, samples must be sealed immediately in airtight containers or polythene bags to prevent moisture loss during transit. The sample is labelled with location, depth, date, and a unique identification number. Prompt delivery to the laboratory is essential to preserve the in-situ moisture condition.
At the laboratory, a clean moisture content container is weighed and its mass recorded (W1). A representative portion of the soil sample is placed in the container. The minimum specimen mass depends on the maximum particle size — 30 g for fine-grained soils, 300 g for medium-grained soils, and 3000 g for coarse-grained soils as per IS 2720 Part 2. The container with wet soil is immediately weighed and recorded as W2.
The container with its lid removed is placed in the thermostatically controlled oven maintained at 110 ± 5°C. The specimen is dried for a minimum of 24 hours. For organic soils or soils containing gypsum, a reduced temperature of 60-80°C is used to prevent decomposition or loss of chemically bound water. The specimen is considered to have reached constant mass when successive weighings at 2-hour intervals show a difference of less than 0.1% of the original specimen mass.
After achieving constant mass, the container is removed from the oven, the lid is replaced, and the container is placed in a desiccator to cool to room temperature. Cooling in a desiccator prevents the dried soil from absorbing atmospheric moisture. Once cooled (typically 30-45 minutes), the container with dried soil is weighed and the mass recorded as W3. At least two specimens are tested from each sample to ensure consistency.
The water content is calculated using the formula: w = [(W2 - W3) / (W3 - W1)] x 100, where W1 is the mass of the empty container, W2 is the mass of container plus wet soil, and W3 is the mass of container plus dry soil. The result is expressed as a percentage to the nearest 0.1%. If two determinations differ by more than 1% for fine-grained soils or 0.5% for coarse-grained soils, the test is repeated.
The NABL-accredited test report includes the sample identification, field location and depth, individual moisture content values for each determination, the average water content, and the test method reference (IS 2720 Part 2). For compaction control samples, the report also notes whether the field moisture falls within the permissible range relative to OMC. Reports are delivered digitally via email within 24-48 hours of sample receipt.

Our test reports carry NABL accreditation (ISO/IEC 17025:2017), accepted by NHAI, state PWDs, courts, and arbitration tribunals. Every result is traceable to national standards through our calibrated equipment chain.
For highway construction projects requiring daily compaction control, we process water content samples within 24 hours of receipt. Our oven capacity accommodates 50+ containers simultaneously, enabling batch processing for large projects.
We use NABL-calibrated electronic balances with a least count of 0.01 g for fine-grained soils and 1 g for coarse-grained soils. Our thermostatically controlled ovens maintain 110 ± 5°C with digital accuracy, ensuring IS 2720 Part 2 compliance.
Water content testing is most valuable when combined with grain size analysis, Atterberg limits, MDD/OMC, and CBR testing. We offer bundled packages that provide complete soil characterisation in a single engagement, reducing cost and coordination.
Our field technicians collect sealed soil samples directly from your project site across Punjab, Haryana, and Himachal Pradesh, ensuring that natural moisture content is preserved from collection to testing without evaporation or contamination.
Soil water content per IS 2720 Part 2:1973 is determined by the oven-drying method, the reference standard: (1) Take 30-50 g of moist soil in a clean, weighed container. (2) Weigh the container + moist soil (W2). (3) Dry in oven at 105°C ± 5°C for 24 hours, or until mass becomes constant. (4) Cool in desiccator, weigh container + dry soil (W3). (5) Calculate Water Content (%) = (W2 − W3) × 100 / (W3 − W1) where W1 is the empty container mass. Field-rapid alternative: speedy moisture meter (IS 2720 Part 2 Appendix A) using calcium carbide reaction — instantaneous result, lower accuracy (±2%); suitable for routine compaction control but not for precise design inputs.
Soil water content is required for: (1) Compaction quality control — must be within ±2% of laboratory OMC at the time of field rolling, verified by speedy meter or oven drying. (2) Field density testing — paired with core cutter or sand replacement to calculate dry density. (3) Atterberg limits testing — at LL, PL, and trial points. (4) CBR test — molding moisture content at OMC. (5) Soil classification — for IS 1498 classification of fine-grained soils. (6) Construction sequencing — verifying soil is dry enough for hauling/rolling. NKMPV provides oven-dried water content as the precise reference value and speedy meter for fast field decisions.
Typical natural (in-situ) water content ranges in Indian field conditions: Cohesionless sand (in dry season): 2-10%; Cohesionless sand (saturated): 15-25%; Silty sand (SM): 8-18%; Lean clay (CL): 15-30%; Fat clay (CH): 25-50%; Black cotton soil: 30-60% (highly variable with monsoon cycle); Organic soils, peat: 80-200%+. Practical interpretation: natural water content well above OMC (typical of monsoon-period black cotton soil) means heavy compaction equipment can't achieve compaction without preliminary drying or stabilisation. Natural water content well below OMC needs water addition during placement. NKMPV provides moisture testing for both routine quality control and project-planning purposes.
Coverage
Wherever your project is, there are two ways to work with NKMPV on Soil Moisture Content Test.
For field work, our engineers and instruments mobilise anywhere in India — highway corridors, bridges, plants and greenfield alignments included.
Distance is not a constraint for laboratory testing. Send samples to our Pinjore laboratory and receive the digital report on completion — the route most of our out-of-region clients use.
These are locations where we have completed projects — not the boundary of our service area. We mobilise across India on request. See full coverage & project locations →
Soil Moisture Content Test is carried out to IS 2720 Part 2:1973, IS 2720 Part 1:1983, IS 2720 Part 8:1983 and IS 1498:1970, as listed in the Applicable Standards section of this page. Tell us the specification your project must comply with and the quotation will state the standard the work follows.
Our laboratory is at Pinjore, Haryana, within same-day reach of Chandigarh, Panchkula, Mohali, Ambala and the wider Tri-City. If you are further away, distance is not a constraint: our field team travels to site anywhere in India for on-site work, and for laboratory tests you can courier samples to the Pinjore lab and receive the report digitally. Clients across Punjab, Haryana, Himachal Pradesh, Delhi-NCR, Uttarakhand, Rajasthan, Uttar Pradesh, Jammu and Kashmir and Ladakh already work with us this way.
Yes. NKMPV operates pan-India. We have delivered projects across Chandigarh, Panchkula, Mohali, Ambala, Karnal, Kurukshetra, Yamunanagar, Hisar and beyond, and we mobilise to greenfield and remote corridors on request. The 18 locations listed on our site are the places we have already worked — not the limit of where we go.
Send us the project details — location, quantity, and the standard you need to comply with — and you get a written quotation, usually within one working day. Pricing depends on sample count, site access and mobilisation distance, so we quote per project rather than publishing a fixed rate. Call +91-82953-60108 or use the quote form; every quotation states the applicable IS/IRC standard.
Need Soil Moisture Content Test for your project?