IRC SP 19 ATCC Survey Procedure — Step-by-Step Guide for NHAI Consultants
The complete IRC SP 19 procedure for ATCC traffic surveys: station spacing, 17-class scheme, 7-day continuous coverage, calibration, manual ground-truth validation, AADT computation, and AADT/VDF/MSA conversion to IRC 37 design traffic.