Case Study: Bridge Load Test on a 30 m PSC Girder ROB in Punjab — How NABL TC-14144 Cleared NHAI Acceptance
An anonymised walk-through of an NKMPV-conducted IRC SP 51 bridge load test on a 30 m PSC girder ROB in Punjab — pre-test inspection, instrumentation, calibrated proof loading, deflection acceptance, and the NABL traceability that cleared NHAI handover acceptance in a single submission.